Infinity Truss & Stage Co., Limited
|
Price: | 26700.0 USD |
Payment Terms: | T/T,L/C,WU,Paypal,Money Gram |
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Steel scaffolding consists of pillars, horizontal pipe, diagonalized pipe, adjustable base, joint pipe,and it is simple and easy to assemble. And it is widely used in events: lifting the line array speaker, LED screen, adertisement posts, as well as different outdoor shows and events and concerts.
Simple diagram for scaffolding parts.
Item Name | Steel scaffolding Structure |
Brand | ITSC |
Material | Q235 |
Surface Treatment | Hot zinc galvanization |
Pillar Pipe | 48*3mm |
2m | |
10.47kg | |
Diagonal Pipe | 48*2.5mm |
2.3m | |
7.6kg | |
Horizontal Pipe | 48*3mm |
Adjustable Foot | 2.245kg |
Cross Section | 2*2m |
Height | 2m-38m |
Advantage | Heavy loading capacity and stable, |
Demountable,easy to assemble and transport | |
Self-locking, non-rust | |
Application | Hanging line array speaker and led screen |
Ootdoor shows and events | |
Packing | standard package or customized |
Delivery Time | 10 working days after 30% payment |
Payment term | L/C,T/T,Western Union,MoneyGram |
Heavy loading capacity and stable,
Demountable,easy to assemble and transport
Self-locking, non-rust
because of the Accessories are not easy to be lost and Good stability, widely used in bridge construction
support, hanging speaker, stage background, light frame and other fields.
Our partners
Negotiating | Specification |
Quantity | |
Price | |
Packing | |
Delivery Time | |
Terms of Payment | |
Claim for Compensation | |
Arbitration | |
Sign a contract | Order goods and stamp |
Transfer payment | Cash, T/T, Western union, Money gram, L/C, ect |
Prepare production | PD study the specification and start to arrange the production, |
Check and Testing | QC checking and testing the quality |
Packing | Generally pack with bubble air or carton according to negotiation |
Step 1 | Material Ready |
Step 2 | Material Cutting |
Step 3 | Board Cutting |
Step 4 | Punching |
Step 5 | Milling |
Step 6 | Welding |
Step7 | Checking |
Step 8 | Testing |
Step 9 | Packing |
By sea: 15-45 days acocording to different countries
It takes 3-5 hours to set up with thespeaker towers
1. Clean, check and maintain your scaffolding on a regular basis.
2. Throw away the damaged or deformed scaffolding, spigot pins or couplers.
3. Make a structural calculation for each construction you build.
4. Store and transport your scaffolding on proper dolly.
5. Attach loads in node points.
6. Check how loads are attached to the speaker towers before lifting.
1. Mix scaffolding rigging of multiple suppliers in one construction, unless specifically stated by manufacturer.
2. Exceed the maximum loading of single spans as specified in the loading tables.
3. Exceed the given structural data of scaffolding.
4. Drill holes in the tubes.
5. Use damaged scaffolding.
6. Attach loads to the scaffoldingdiagonals.
1. All goods are only factory competitive price guarantee and 100% quality inspection before delivery.
2. Instant feedback for any inquiry.
3. Professional designs and welding.
4. Quality satisfaction guarantee 100% return policy.
5. Sample or trial order is acceptable, Mixed order support, fast delivery.
6. Much rich experience in dealing with international trade and declaration with more than 8 years in this line.
We have been designing and manufacturing event truss and stages many years. Our leading design teams and strict quality control systems ensure each product from ITSC truss is reliable and ideal deals. Our quality products have well met demands of all clients around the world.
With our own factory and product line, ITSC truss can ensure the fastest delivery in the industry. What's more, we have accumulated rich resources in shipping channels, which also promise our fastest delivery time. Our standard cases can be finished within 7days and those custom-made within 8 days.
We are committed to providing the most affordable products for all customers. We have our own factory and massive production line. This ensures that we can procure all materials at much lower price than our competitors.
We promise all products from ITSC truss are the most affordable in the industry.
Choose your most reliable supplier, choose ITSC truss!
In a word, we are one of the most professional and reliable truss and stages suppliers in China. Please come to us!
ITSC truss is a professional supplier and solution provider of exhibition and display system, located in Guangzhou, China.Our factory is near Baiyun AirPort, about thirty minutes drive from Baiyun Airport to factory.
Our products range includes standard and custom made exhibition booth, and we also produce tension fabric fast trade show booth and aluminum truss system and layer.
About trade show services in China, we also can make and sell alumninum truss exhibition booth for your needed booth building services in different exhibition centers in Guangzhou,Shanghai, Beijing, Guangzhou, Shenzhen.
We believe that quality is the life of the factory.
Providing the high-quality products is our company's responsibility.
ITSC trus is willing to co-operate with you and create the future brilliance together. Thank you!
Welcome to Shanghai; Welcome to ITSC truss
Steel scaffolding in stock in our factory.
Steel scaffolding structure for the stage lighting fixture and LED screen and line array sound system in concerts and big events!
34x6x16m with 35000 kg ballast,13 led panels+2 line arrays susppended from scaffolding. Ringlock scaff system installed for AVB concert at Koltatta.