Infinity Truss & Stage Co., Limited
|
Price: | 30000.0 USD |
Payment Terms: | T/T,L/C,WU,Paypal,Money Gram |
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Overview:
Triangular Roof Truss Structure ITSC-R161209 is standard available in 14x12m, 16x12m, 18x14m and 20x14m. The beams can be 520x520mm,ect and pillars can 390x390mm or 400x400mm truss segments. PA wings are available.
This is heavy duty design for medium shows, and its capacity can be 10000kg + 2x 1000kg(PA Soundwings)
Specification:
Dimension | 16x12x9m / 52x40x30ft | |
Main grid | 390x390mm Quatro Trussing | |
Pillars | 390x390mm Quatro Trussing | |
Transport volume | Approx. 45cbm | |
Weight | Approxi. 6000kg | |
Windspeed | 28.5 s/m | |
Capacity | 10000kg | |
Roof Price | USD30, 000. 00 | |
Stage Price | USD26, 000. 00 |
We design the structure for free!
Front View:
Side View:
Dimensions | 20x14m | 18x14m | 16x12m | 14x12m |
A: Inside Roof | 21x13,7m | 19x13,7m | 17x11,7m | 15x11,7m |
B: Outside Roof | 21,7x13,7m | 19,7x13,7m | 17,7x11,7m | 15,7x11,7m |
C: Clearance | 10,87m | 10,87m | 10,87m | 10,87m |
D: Tower height | 12,49m | 12,49m | 12,49m | 12,49m |
E: Rooftop height | 14,12m | 13,87m | 13,37m | 13,12m |
F: Outside incl. PA | 31,07m | 29,07m | 27,07m | 25,07m |
G: PA-Wing | 4,00m | 4,00m | 4,00m | 4,00m |
Loading Capacity:
The Uniformly Distrubuted Load in 10m span is 260kg/m
The Uniformly Distrubuted Load in 20m span is 58kg/m
Structure can be devided into 2 just with addtional parts.
All the trusses are tested before deliveried.
What are the different typs of trusses? Below are some of our common trusses, others are custom-made.
Order process:
A quick look into order:
A detailed look into order:
Negotiate truss | Specification |
Quantity | |
Price | |
Packing | |
Delivery Time | |
Terms of Payment | |
Claim for Compensation | |
Arbitration | |
Sign a contract | Order goods and stamp |
Transfer payment | Cash, T/T, Western union, Money gram, L/C, ect |
Prepare production | PD study the specification and start to arrange the production, |
Check and Testing | QC checking and testing the quality |
Packing | Generally pack with bubble air or carton according to negotiation |
Prepare documents | Calculate the weight and volume for clearance documents: packing list, invoice, B/L, ect. And other special documents for clearance in different countries. |
Shipment | Arrange container and load and ready to delivery. Usually takes 12-45days depending on different areas. |
Insurance | Buy the insurance according to the goods price |
Bill of Lading | Will deliver the B/L to clients by door to door service |
Production process:
A quick look into how to produce the Truss Structure.
A detailed look into production:
Step 1 | Material Ready |
Step 2 | Material Cutting |
Step 3 | Board Cutting |
Step 4 | Punching |
Step 5 | Milling |
Step 6 | Welding |
Step7 | Checking |
Step 8 | Testing |
Step 9 | Packing |
If you need to hang more stage lighting in the middle, you can add more cross beams trusses rigging in the middle to hightlight the stages.
Iron scaffolding trusses can be also installed at the back of the Rooftop as backdrop. and many stage lighting clamps can be attached to the trusses rigging to hang the lighting futures.
The whole Triangular Truss Structure are installed with mobile stages on the grass with Barricades for audience in outdoor concerts.
Delivery:
Asia delivery is within 20 days; America and Europ is within 30days
Free loading on container
FAQ:
Is it factory?
Yes, we are factory from China;
Can we visit factory?
Yes, we can offer free pick-up from Airport for client;
Can you design and draw the structure with CAD?
Yes.